Archive for August, 2017

August 11, 2017

Reedham, Somerleyton and Trowse Swing Bridges

Reedham Swing Bridge

Latest Network Rail bridge update from the Broads Authority as at 11 August 2017:

  •  Reedham Swing Bridge  – Operating
  •  Somerleyton Swing Bridge  – Operating *
  • Trowse Swing Bridge – repaired and will open with 24 hours notice

 

*We have been informed that Somerleyton Swing Bridge is now operational as the cable has been fixed.