Archive for March, 2018

March 23, 2018

Lowestoft Harbour Survey – from 26 April 2018

Mariners and Port Users are advised that survey work is scheduled to commence on 26/04/2018 in the Outer Bridge Channel, and in the RN&SYC basin.

The work will be undertaken by the 8.9 m catamaran Eagle, with the survey equipment on a short tow, operating at a speed of between 0 & 4 knots. The vessel will monitor VHF Ch.14.

Other vessels are requested to afford the works a wide berth, and pass the areas at slow speed to reduce vessel wash.

Works are expected to take approximately 10 days to complete, weather permitting.

Please contact Lowestoft Port Control, VHF Ch14, or Tel. 01502 572286, if further information is required.

 