Lowestoft Harbour Survey – from 26 April 2018

Mariners and Port Users are advised that survey work is scheduled to commence on 26/04/2018 in the Outer Bridge Channel, and in the RN&SYC basin.

The work will be undertaken by the 8.9 m catamaran Eagle, with the survey equipment on a short tow, operating at a speed of between 0 & 4 knots. The vessel will monitor VHF Ch.14.

Other vessels are requested to afford the works a wide berth, and pass the areas at slow speed to reduce vessel wash.

Works are expected to take approximately 10 days to complete, weather permitting.

Please contact Lowestoft Port Control, VHF Ch14, or Tel. 01502 572286, if further information is required.

 

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

w

Connecting to %s

%d bloggers like this: