Dredging work around Horning – from 24 April

As part of the 2018/19 planned dredging programme dredging is due to start on the River Bure 300 metres upstream of Horning Swan.  This work will start on Tuesday 24 April 2018, various sections will be dredged between Horning Swan corner and Cockshoot Dyke.  Please be aware of manoeuvring vessels at the dredge site and at the offload site at Horning Hall, this is 500 metres upstream of the mouth of the River Ant.  If you require more information in relation to this work phone Tim Lamb 07771676074.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

%d bloggers like this: